Sign In | Join Free | My xuijs.com
China China Century Marine Equipment Co., Ltd logo
China Century Marine Equipment Co., Ltd
China Century Marine Equipment Co., Ltd Marine & offshore equipment for you, integrity,good quality and service.
Active Member

5 Years

Home > Marine propulsion system >

Forged Steel Marine Propeller Shaft/Ship Shaft Long Tail Boat Shaft

China Century Marine Equipment Co., Ltd

Forged Steel Marine Propeller Shaft/Ship Shaft Long Tail Boat Shaft

  • 1
  • 2

Brand Name : CCME

Model Number : CCM5

Certification : ABS CCS BV KR DNV etc

Place of Origin : Jiangsu

MOQ : 1

Price : negotiable

Payment Terms : T/T L/C

Supply Ability : 10 per month

Delivery Time : per to your requests

Packaging Details : standard packaging

Torque Capacity : Depends on model

Material : Steel

size : Optional

Contact Now

The details of marine propeller shaft as follows,
1.Material:H13,4130,4140,4150,4340,1035,1045,EN9,EN19,EN24,EN31,51200,SUJ2,100Cr6,K310,34CrNiMo6,36CrNiMo4,42CrMo4,86CrMoV7, C35E, C40E, C45E, etc.
2.Hardness: HB240-320
3.Ultrasonic Test: Sep 1921-84 - Test Group 3 Class D or ASTM A388 - FBH max 4mm
4.Forging reduction ratio: ≥4
5.Manufacturing process: steel ingot→forging→rough machining→QT→2th rough machining→finishing machining→packing→delivery
6.Quality required: Surface defect and decarburization shall be free. All dimensions are 100% OK.
7.Packing: wooden box or metal pallet for protection against rust and damage.
8.Quality Management Certification: ISO 9001:2008.


Product NameSpecificationMain Materials
marine propeller shaftDia.80~ Dia.1500mm
Length≤12000mm
H13,4130,4140,4150,4340,
EN9,EN19,EN24,EN31,etc

  1. Marine Forged Propeller Shaft

    1. materials: Carbon steel Carbon manganese steel Alloy steel
    2. length: max 14m
    3. weight of single piece: 3 ton to 40 tons
    8. certifications: ISO9001 CCS ABS BV LR etc.
    5. ISO9001 : certified
    6. 4000T advanced hydraulic pressure machine
    7. test: 100% Ultrasonic flaw detection test
    8. production capacity: 20,000 tons per year
    9. delivery time: according to the quantity and size, usually within 35 days.
    10. Forging way:free forging
    11.Flange diameter: max2.3m

Mooring Chock,EU Type Deck Mounted Towing Chock

You may sent us inquiry by bellow mail,thanks!
Master@ccmemarine.com



Best Forged Steel Marine Propeller Shaft/Ship Shaft Long Tail Boat Shaft wholesale

Forged Steel Marine Propeller Shaft/Ship Shaft Long Tail Boat Shaft Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: China Century Marine Equipment Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0